725 Black Diamond Blvd, Winnipeg, MB

New Industrial Building in St. Boniface Business Park

Overview

  • New construction located just off of Mazenod Road in the St. Boniface Industrial Park, the largest industrial park in East Winnipeg

  • Loading: 3 Grade and 3 Dock (60k hydraulic docks)

  • Ceiling height: 29’ - 30’ clear

  • Compound space available

  • Convenient access to major transportation routes including Dugald Road, Plessis Road, the Trans-Canada Highway and Perimeter Highway

  • Available Sizes: +/- 6,600, 13,200, or 19,800 sf

  • Net Lease Rate: $12.95 psf

  • Additional Rent (est. 2024) : $4.00 psf

  • M3 - Manufacturing


Previous
Previous

140 Bannatyne Avenue, Winnipeg, MB

Next
Next

30 Clover Drive, Stony Mountain, MB